Trees Road Lower, junction of Sycamore Road to South Avenue
Work will continue on water main rehabilitation on Trees Road lower until Friday 18th February 2011 between 8am-6pm.

Stradbrook Road / Deans Grange Road Junction
Works will continue on the Stradbrook Road / Deans Grange Road Junction until Friday 4th February 2011 between the hours of 8am and 6pm, traffic should not be affected.

Foxrock Church to Dún Laoghaire Dart Station QBC and Cycle Track Scheme-Kill Avenue Section
Quality Bus Corridor (QBC) works continuing on Kill Avenue. A Traffic management plan in operation.

Marine Road/ Crofton Road/ Queens Road: Pedestrian walkway at the Metals with upgrade works to Crofton Rd, Marine Rd & Queens Rd
Marine Rd / Crofton Rd / Queens Rd will undergo resurfacing & alignment works with new public lighting & tree planting. A new signalized pedestrian crossing point will be provided outside the Dart Station. The signalised junction between Marine Rd / Crofton Rd / Queens Rd will be upgraded to create greater pedestrian areas with wider pavements and a public space being provided outside Meadows & Byrne. Works commenced in May 2010 on Crofton Rd and will proceed in a phased manner throughout the scheme with a completion date of May 2011.

Mounttown Road Lower, Glenageary Road Upper, Kill Lane (part)
The roadworks are nearing completion on Glenageary Road Upper, Kill Avenue (part of) and at the existing Mounttown Roundabout junction to convert the junction to a traffic signalled junction. In January 2011, works will recommence on Glenageary Road Upper, where connection works for a new watermain and road resurfacing works have to be completed. These works will require stop/go traffic management operations. There will be other sections of Mounttown Road Lower and around the overall roadworks site where finishing and snagging works and road resurfacing works will require stop/go traffic management operations. The red asphalt material for the cyclepaths will not be laid until March 2011 due to manufacturer’s temperature restrictions. All these works are being carried out, by Cosgrave Developments, as part of the Planning Conditions for the adjacent Cosgrave development (Old Dún Laoghaire Golf Club South).

Georges Street Upper, Dun Laoghaire
Works will continue on Georges Street Upper to facilitate the installation of a pedestrian crossing and raiased junction platforms until March 2011 between the hours of 8am to 6pm.

Sallynoggin Road
Works will take place to upgrade the existing pedestrian crossings along Sallynoggin road and to facilitate the installation of a new pedestrian crossing west of the Maxol garage. Slight footpath restrictions will be encountered along Sallynoggin road until February 11th when the work will be completed.

Abbey Road, Stradbrook Road
Lane and footpath restrictions will be in place to facilitate the upgrading of the roundabout at the existing bus stop location until Friday 4th February 2011. The existing bus stop will be removed and the roundabout will be upgraded to reduce traffic speeds and increase safety for cyclists, pedestrians and vulnerable road users. The works will take place between the hours of 8am-4pm. A traffic management plan will be in place.

Merville Road (at the back of St. Raphaela’s School)
Pedestrian access restrictions to facilitate the wheelchair accessible ramp construction works from Monday 15th November 2010 to Friday 4th February 2011 between 9 am to 5 pm.

Main Street Blackrock, Blackrock Village
The water main rehabilitation project commenced in Blackrock Village on 4th January and will continue till Friday 25th February 2011. Work will take place between 9am-5pm with temporary Stop/Go in operation on Main Street, starting at Rock Hill, heading towards the junction of Main Street with Carysfort Avenue. A Traffic Management Plan will be in operation for the duration of the works

Kilmacud Road Lower
Murphy Surveys LTD will be carrying out topographical surveys on Kilmacud Road Lower between the N11 and Drummartin Link Road starting on Monday 10th January and continuing until the 18th February 2011.

N11 from Loughlinstown Roundabout to Foxrock Church
Minor traffic restrictions will be in place on the N11 between Foxrock Church and UCD on 29th & 30th January between 06:00 – 14:00 to facilitate road sweeping.

Rock Road
Traffic restrictions will be in place at various locations along the Rock Road from 20th January to 9th February between 10:00 – 16:00 to facilitate manhole cover repairs

Marine Road adjacent to Pavilion Shopping Centre Entrance and St Michaels Church
Work will be carried out to complete the installation of ducting in footpath and installation of a minipillar from Monday 31st January until Friday 4th February 2011. Traffic lanes will not be affected.

Dalkey Dart Station – Railway Road
Reinstatement works will be carried out on the recently widened road adjacent to the bridge and sign poles will be installed on Cunningham Road and Ardeevin Road from Thursday 27th January until Friday 4th February 2011 between 08:00 – 17:00

Rock Road
Works will be carried on the Rock Road near Sion Hill to facilitate reinstatement works on Monday 31st January 2011 between 10:00 – 16:00.